Spoolset › Charts › ¼″ per foot slope chart

¼″ per foot slope chart

¼″ per foot is 2.083%, a ratio of 1 in 48.0. Here is the fall it produces over any run.

Every figure on this page is produced by the same code as the Spoolset app — not re-typed from it.

The same slope, said three ways

Expressed asValue
Inches per foot¼″ per foot
Percent2.0833%
Ratio1 in 48.00
Millimetres per metre20.8 mm/m

¼″ per foot is the standard minimum for sanitary drainage 2½″ and smaller in IPC Table 704.1, and it is the number worth recognising instantly when a drawing quotes 2.08% instead. They are the same slope.

Fall over a run

RunFallFall (decimal inches)
1′1/4"0.250″
2′1/2"0.500″
3′3/4"0.750″
4′1"1.000″
5′1-1/4"1.250″
6′1-1/2"1.500″
8′2"2.000″
10′2-1/2"2.500″
12′3"3.000″
15′3-3/4"3.750″
20′5"5.000″
25′6-1/4"6.250″
30′7-1/2"7.500″
40′10"10.000″
50′12-1/2"12.500″
60′15"15.000″
75′18-3/4"18.750″
100′2' 1"25.000″

The arithmetic is one multiplication: run in feet × 0.25 gives the fall in inches. Everything above is that, rounded to the nearest sixteenth.

Checking a run you have already installed

Measure the drop between two points and divide by the distance: grade % = (rise / run) × 100, or inches per foot = (rise / run) × 12 with both in the same unit.

A 2.000″ drop over an 8′ run is 2.083% — ¼″ per foot. The same slope, said twice.

Related charts

⅛″ per foot slope

Fall over any run at the large-pipe grade.

Drain slope by pipe size

IPC Table 704.1 minimum slopes, with the fall they produce.

Percent ↔ inches per foot

The conversion both ways, for drawings that quote a percentage.

Travel vs cut length

Why the number the formula gives is not the number you cut.

Do this on the job, not at a desk

Spoolset runs these calculations on an iPhone and draws the shape to scale as you type, so a mistyped number shows up as a wrong picture. It cites the source of every table it uses. Simple offsets and grade are free; rolling offsets and the take-out tables are a one-time purchase.